Featured builds>Yea Project

Yea Project

Murrindindi / Taungurung

Yea Project

The Yea project is nestled in a valley where the Yea and Goulburn rivers meet.

Pristine waterways made up of lakes, rivers, mountain streams and water holes juxtapose an alpine wilderness of lush valleys, rolling plains and epic peaks.

Ignited by world events our clients have created a haven from the hectic pace of day-to-day city life.

Sited with a stunning western aspect, the design settles into the contours of the land. The fenestration provides abundant natural daylight and delivers on our clients brief of uninterrupted views.

The modular home is autonomous on the site, producing its own power with a PV solar array and battery storage, capturing rainwater, and treating and disposing of wastewater with an on-site gravity fed system, eliminating operating costs of the home and adding to the overall environmental sustainability.

Constructed to adhere to a BAL 29 the exterior is robust yet reflective of its natural location with the addition of accent timber decking.

Specifications

Modules3
Living area169m2
Deck47m2
From$720,000 + GST
brochure-form

Enter your details to receive the Ecoliv brochure including our complete range, process, and sustainability guide.